|
Sunshine Act Meeting Notice
Dec 18, 2012 (FIND, Inc. via COMTEX) --
The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal Energy Regulatory Commission.
DATE AND TIME: December 20, 2012 10:00 a.m.
PLACE: Room 2C, 888 First Street NE., Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda
* Note--Items listed on the agenda may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502-8400.
For a recorded message listing items, struck from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission's Web site at http://www.ferc.gov using the eLibrary link, or may be examined in the Commission's Public Reference Room.
988th--Meeting
Regular Meeting December 20, 2012, 10:00 a.m.
Item No. Docket No. Company
Administrative
A-1 AD02-1-000 Agency Business Matters.
A-2 AD02-7-000 Customer Matters,
Reliability, Security and
Market Operations.
Electric
E-1 RM10-11-001 Integration of Variable
Energy Resources.
E-2 EL11-44-001 Iberdrola Renewables,
Inc., PacificCorp,
NextEra Energy Resources,
LLC, Invenergy Wind North
America LLC, and Horizon
Wind Energy LLC v.
Bonneville Power
Administration.
E-3 EL11-44-002 Iberdrola Renewables,
Inc., PacifiCorp, NextEra
Energy Resources, LLC,
Invenergy Wind North
America LLC, and Horizon
Wind Energy LLC v.
Bonneville Power
Administration.
E-4 RM11-12-000 Availability of E-Tag
Information to Commission
Staff.
E-5 RM12-6-000 RM12-7-000 Revisions to Electric
Reliability Organization
Definition of Bulk
Electric System and Rules
of Procedure.
E-6 OMITTED
E-7 RR12-8-000 North American Electric
Reliability Corporation.
E-8 NP11-238-001 North American Electric
Reliability Corporation.
E-9 RM12-9-000 Regional Reliability
Standard
PRC-006-SERC-01-Automatic
Underfrequency Load
Shedding Requirements.
E-10 OMITTED
E-11 ER13-178-000 Southwest Power Pool,
Inc.
E-12 ER13-207-000 City of Colton,
California.
E-13 ER13-168-000 California Independent
System Operator
Corporation.
E-14 ER13-218-000 California Independent
System Operator
Corporation.
E-15 ER13-219-000 California Independent
System Operator
Corporation.
E-16 ER13-49-000 Valley Electric
Association, Inc.
E-17 EC12-119-000 FirstEnergy Generation
Corp. and American
Transmission System,
Incorporated.
E-18 OMITTED
E-19 OMITTED
E-20 OMITTED
E-21 OMITTED
E-22 EL12-109-000 Avalon Wind, LLC, Avalon
Wind 2, LLC, Catalina
Solar, LLC, Catalina
Solar 2, LLC, Pacific
Wind Lessee, LLC, Pacific
Wind 2, LLC, Valentine
Solar, LLC, and EDF
Renewables Development,
Inc.
E-23 OMITTED
Gas
G-1 RP11-2061-002, Northern Natural Gas
RP11-2061-003 Company.
G-2 RP12-814-000 Gulf Crossing Pipeline
Company LLC.
G-3 RP12-820-000 Texas Gas Transmission,
LLC.
G-4 RP12-813-000 Gulf South Pipeline
Company, LP.
G-5 OR12-27-000 Enbridge Pipelines
(Southern Lights) LLC.
Hydro
H-1 P-13213-004 Lock 14 Hydro Partners,
P-13214-004 LLC.
Lock 12 Hydro Partners,
LLC.
H-2 P-14354-001 Utah Independent Power,
Inc.
H-3 HB81-09-2-002 Hudson River-Black River
Regulating District, Erie
Boulevard Hydropower
L.P., Curtis/Palmer
Hydroelectric Co., South
Glens Falls Limited
Partnership, et al.,
Northern Electric Power
Co., et al., Fort Miller
Associates, Stillwater
Hydro Associates, New
York State Electric & Gas
Corp., Albany Engineering
Corporation, and Green
Island Power Co.
Certificates
C-1 RM12-11-000 Revisions to the
Auxiliary Installations,
Replacement Facilities,
and Siting and
Maintenance Regulations.
C-2 CP12-25-000 Brian Hamilton v. El Paso
Natural Gas Company.
C-3 CP12-72-000 Dominion Transmission,
Inc.
Dated: December 13, 2012.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov's Calendar of Events and locating this event in the Calendar. The event will contain a link to its webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service.
[FR Doc. 2012-30544 Filed 12-14-12; 4:15 pm]
BILLING CODE 6717-01-P
Vol. 77, No. 243
Notices
[ Back To Smart Grid Home's Homepage ]
|